| 16. | X and Y can do a piece of work in 20 days and 12 days respectively. X started the work alone and then after 4 days Y joined him till the completion of the work. How long did the work last? | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Answer: Option B Explanation:
Hence, total time taken = (6 + 4) days = 10 days. |
| 17. | A is 30% more efficient than B. How much time will they, working together, take to complete a job which A alone could have done in 23 days? | |||||||||||||||||||||||||||||||||||||||||||
Answer: Option B Explanation: Ratio of times taken by A and B = 100 : 130 = 10 : 13. Suppose B takes x days to do the work.
Therefore, A and B together can complete the work in 13 days. |
| 18. | Ravi and Kumar are working on an assignment. Ravi takes 6 hours to type 32 pages on a computer, while Kumar takes 5 hours to type 40 pages. How much time will they take, working together on two different computers to type an assignment of 110 pages? | |||||||||||||||||||||||||||||||||||||||
Answer: Option C Explanation:
|
| 19. | A, B and C can complete a piece of work in 24, 6 and 12 days respectively. Working together, they will complete the same work in: | |||||||||||||||||||||||||||||||||||||||||||||||||||
Answer: Option C Explanation:
|
| 20. | Sakshi can do a piece of work in 20 days. Tanya is 25% more efficient than Sakshi. The number of days taken by Tanya to do the same piece of work is: | ||||||||||||
Answer: Option B Explanation: Ratio of times taken by Sakshi and Tanya = 125 : 100 = 5 : 4. Suppose Tanya takes x days to do the work.
Hence, Tanya takes 16 days to complete the work. |
| 21. | A takes twice as much time as B or thrice as much time as C to finish a piece of work. Working together, they can finish the work in 2 days. B can do the work alone in: | ||||||||||||||||||||||||||||||||||
Answer: Option B Explanation:
So, B takes (12/2) = 6 days to finish the work. |
| 22. | A and B can complete a work in 15 days and 10 days respectively. They started doing the work together but after 2 days B had to leave and A alone completed the remaining work. The whole work was completed in : | |||||||||||||||||||||||||||||||||||||||||||||||||||||
Answer: Option C Explanation:
Hence, the total time taken = (10 + 2) = 12 days. |
| 23. | A and B can do a piece of work in 30 days, while B and C can do the same work in 24 days and C and A in 20 days. They all work together for 10 days when B and C leave. How many days more will A take to finish the work? | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Answer: Option A Explanation:
|
| 24. | A works twice as fast as B. If B can complete a work in 12 days independently, the number of days in which A and B can together finish the work in : | ||||||||||||||||||||||||||||||
Answer: Option A Explanation: Ratio of rates of working of A and B = 2 : 1. So, ratio of times taken = 1 : 2.
So, A and B together can finish the work in 4 days. |
| 25. | Twenty women can do a work in sixteen days. Sixteen men can complete the same work in fifteen days. What is the ratio between the capacity of a man and a woman? | ||||||||||||||||||||||||||||||||
Answer: Option B Explanation: (20 x 16) women can complete the work in 1 day.
(16 x 15) men can complete the work in 1 day.
|
| 26. | A and B can do a work in 8 days, B and C can do the same work in 12 days. A, B and C together can finish it in 6 days. A and C together will do it in : | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Answer: Option C Explanation:
So, A and C together will do the work in 8 days. |
| 27. | A can finish a work in 24 days, B in 9 days and C in 12 days. B and C start the work but are forced to leave after 3 days. The remaining work was done by A in: | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Answer: Option C Explanation:
|
| 28. | X can do a piece of work in 40 days. He works at it for 8 days and then Y finished it in 16 days. How long will they together take to complete the work? | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Answer: Option A Explanation:
|
| 29. | A and B can do a job together in 7 days. A is 1 | |||||||||||||||||||||||||||||||||||||||||||
Answer: Option B Explanation:
Let A's and B's 1 day's work be 7x and 4x respectively.
|
| 30. | A and B together can do a piece of work in 30 days. A having worked for 16 days, B finishes the remaining work alone in 44 days. In how many days shall B finish the whole work alone? | |||||||||||||||||||||
Answer: Option C Explanation: Let A's 1 day's work = x and B's 1 day's work = y.
Hence, B alone shall finish the whole work in 60 days. |
No comments: